Challenges

Global supply chain issues, such as semiconductor shortages, can impact production and delivery.
  • Budgeting and Forecasting process being performed in spreadsheets and multi dimensional modelling was a challenge to plan at a granular levels
  • As all the regions data was managed in spreadsheets, consolidating the data and formatting to bring the data into a compatible format was a huge effort
  • Product Hierarchy rolls down to SKU level and the combinations led to higher model size and performance issues
  • Since the cost allocation happened at multiple levels [Group - Class - Category - Brand - SKU], distribution of the targets and reconciling with the targets was tedious
  • Defectives and Trade Ins process were loss generating and it was difficult to understand the root cause, in optimizing the cost

Our Approach

01
The existing excel based planning process was cumbersome, often taking up to 3 weeks to develop rolling forecast.
  • Understood the budgeting and forecasting process and the stakeholders involved in the budgeting process and created a workflow mechanism to provide access only to the respective stakeholders who owns or contributes to the process
  • Standardized templates has been prepared for all the uploads across the budgeting and forecasting process to feed the data into the system with minimal data formatting and transformations
  • Predefined allocation proportions are calculated based on the historical and AOP trends and auto-populated to the planning process to reduce the manual effort and additional overrides provided wherever required
  • Customized the Profit and Loss schedule of Defectives and Trade-In Process to eliminate the additional layer of complexities in the calculations and to provide the insight of the gains/loss generated for the period

Delivered Outcomes

Global supply chain issues, such as semiconductor shortages, can impact production and delivery.
  • Optimised 30% of the model size with simplified product hierarchy
  • Reduced 90% of the manual effort by automating allocations
  • Effective inventory management with improved visibility of trade-in and defects
  • Insightful visuals on the profit or loss generated and the deviation between actual, budget and forecast across multiple levels

Let’s Transform Your Business Together

Have a challenge you need solved? Reach out to us today!
Stay in the loop and sign up for the Matasma newsletter.
By clicking Sign Up you're confirming that you agree with our Terms and Conditions.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.